Bear with me everyone. Trying to coordinate a beta program takes a bit more time than I imagined. Combine that with trying to wrap up the beta itself, and I am going slightly slower than expected.
Here are some screenshots of Klok 2 with some of the new features shown.

The main Klok 2 interface.

The Klok 2 Synchronization panel (With Klokwork connector installed)

The new Week picker

The new Time Picker

The Project view (with new Add Sub Project button) and Description tab visible